Video

Video | VolkerFitzpatrick installs tonnes of steelwork for new mainline station

https://www.youtube.com/watch?v=R6EDKRobb5E

VolkerFitzpatrick has installed tonnes of steelwork for the concourse of a new mainline railway station in Brent Cross.

The operation, which took place from 28 August under a 72-hour possession, marked the next phase of construction at the station, which is being built on the Midland Main Line and Thameslink routes, positioned between the existing Hendon and Cricklewood stations.

Following the installation of the second part of a new overbridge earlier in August, VolkerFitzpatrick began lifting in the concourse’s new main floor beams along with upper and lower columns and roof beams on 28 August. The biggest beams reach 13.5m in length, and weigh up to three tonnes each.

Register for free and continue reading

This is not a paywall. Registration allows us to enhance your experience across Construction Management and ensure we deliver you quality editorial content.

Registering also means you can manage your own CPDs, comments, newsletter sign-ups and privacy settings.

Story for CM? Get in touch via email: [email protected]

Latest articles in Video