News

Skanska Costain JV trials electric telehandler on HS2

The Skanska Costain Strabag (SCS) joint venture, which is building a 250km section of HS2 between London and Birmingham, is trialling an electric telehandler on its site in West Ruislip.

Manufactured by Faresin and supplied by plant hire firm Flannery, the electric unit is estimated to have saved over 400 litres of fuel compared to a traditional telehandler with a combustion engine.

The machine’s manufacturer claims that it offers the same performance as an equivalent conventional model but without the noise and emissions of a combustion engine. It also offers reduced charging times and “notable savings” in maintenance when compared to a combustion engine telehandler.

Register for free and continue reading

This is not a paywall. Registration allows us to enhance your experience across Construction Management and ensure we deliver you quality editorial content.

Registering also means you can manage your own CPDs, comments, newsletter sign-ups and privacy settings.

Story for CM? Get in touch via email: [email protected]

Latest articles in News