Construction Management is the highest circulation construction-based publication serving the UK built environment.
News
Photos | 2,660 solar panels installed at Portsmouth International Port
Neil Gerrard Associate editor
The solar canopy at Portsmouth International Port will provide shade for waiting cars
Energy services firm Custom Solar has installed 2,660 solar panels at Portsmouth International Port.
Work to build the huge solar and battery system at the port began in February 2022. It incorporates roof-mounted solar panels across a number of buildings, a large battery and solar canopies.
The 2,660 panels will contribute around 35% of the site’s power.
The port eventually hopes to offer shore power for smaller ships, without having to take extra power from the local electricity grid.
This is not a paywall. Registration allows us to enhance your experience across Construction Management and ensure we deliver you quality editorial content.
Registering also means you can manage your own CPDs, comments, newsletter sign-ups and privacy settings.
When complete, the 1.2MW peak system will be the largest solar and battery installation to date across Portsmouth City Council’s portfolio of renewable generation systems.
As well as generating carbon-free power, the solar canopies will provide shade for cars waiting to board ferries.
The battery, with a capacity of 1.5MW/hours (enough to run a typical home for four months), will capture power that would otherwise be exported from the site, which can then be used at the port when needed.
When complete, it is estimated that in peak conditions 98% of the electricity consumed by the port will come from the solar and battery, combined.
Jerry Clarke, pilot and senior project manager at Portsmouth International Port, added: “The port is owned by the people of Portsmouth, so we have a obligation to reduce the impact of our operations on the environment, whilst reaching the ambitions set out in our 20 year masterplan.
“Combined with other sustainability initiatives, it will help us achieve our ambition of reaching net-zero carbon by 2030, and becoming one of the UK’s first zero emission ports by 2050.”
The January/February 2026 issue of Construction Management magazine is now available to read in digital format.
Powered Access
CM, in partnership with IPAF, has launched a new survey to explore the industry’s views and experiences with powered access machines on construction projects.
This is not a first step towards a paywall. We need readers to register with us to help sustain creation of quality editorial content on Construction Management. Registering also means you can manage your own CPDs, comments, newsletter sign-ups and privacy settings. Thank you.