
Mace says it saved over a tonne of carbon and reduced 95% of waste by using a new prefabricated wall system on a commercial office project in the City of London.
The contractor claimed that using Eekowall, a new prefabricated wall system, also led to a 411% faster build than traditional methods – the equivalent of 81.3 days of onsite time.
Eekowall uses dry-lined panels preassembled to a specified height, interlocked and fixed. The panels can incorporate door and service openings. They also contain integrated conduit channels to direct electrical or data cables to any position within the wall module.
Register for free and continue reading
This is not a paywall. Registration allows us to enhance your experience across Construction Management and ensure we deliver you quality editorial content.
Registering also means you can manage your own CPDs, comments, newsletter sign-ups and privacy settings.









