Construction Management is the highest circulation construction-based publication serving the UK built environment.
News
Keltbray partners with Saint-Gobain for glass waste recycling scheme
Cristina Lago Deputy Editor
The glass waste recycling initiative is part of the Glass Forever Programme (Image: Keltbray)
Keltbray is working with Saint-Gobain Glass UK and Ireland to collect glass waste – known as cullet – from a London project for closed-loop recycling as part of a glass recycling programme.
The contractors will collect the cullet from 1 Victoria Street for developer Stanhope.
According to Keltbray, only 1% of glass waste from construction and demolition is recycled into new glass, and much of it is often ‘downcycled’ into sand or aggregates.
This is not a paywall. Registration allows us to enhance your experience across Construction Management and ensure we deliver you quality editorial content.
Registering also means you can manage your own CPDs, comments, newsletter sign-ups and privacy settings.
Collecting glass for recycling requires an alternative strip-out methodology and tight process control as common materials associated with demolition, such as plasterboard, can contaminate the cullet, making it unsuitable for remanufacturing into new glazing solutions.
The reuse of cullet in the production of new glass reduces the quantity of raw materials required. It also reduces energy requirements at the furnace during production, as cullet can be melted at lower temperatures than raw materials.
Saint-Gobain Glass estimates that each tonne of cullet salvaged saves enough energy to power the average home for six months, and prevents 300kg of CO2e from entering the atmosphere.
Closed-loop recycling of the glass was specified on this project at the tender stage by Stanhope, supported by an appraisal carried out by Arup and enabled by the Keltbray team through the partnership with Saint-Gobain Glass.
The January/February 2026 issue of Construction Management magazine is now available to read in digital format.
Powered Access
CM, in partnership with IPAF, has launched a new survey to explore the industry’s views and experiences with powered access machines on construction projects.
This is not a first step towards a paywall. We need readers to register with us to help sustain creation of quality editorial content on Construction Management. Registering also means you can manage your own CPDs, comments, newsletter sign-ups and privacy settings. Thank you.