News

In pictures | Volker lifts new Sunderland bridge into place

The New Wear Footbridge steel section arriving by barge
The steel section arrived by barge from Belgium, where it was manufactured

VolkerStevin has lifted into place the final steel section of the New Wear footbridge in Sunderland.

Spanning 105m, the steel section is the last part of the structural frame to be installed before fitting out works can begin.

The New Wear Footbridge lifted into place
The bridge spans both the north and south banks of the River Wear and will connect the former Vaux Brewery site and the Sheepfolds

Civil engineer VolkerStevin has overseen the complex development and installation of the £31m pedestrian and cyclist bridge.

Register for free and continue reading

This is not a paywall. Registration allows us to enhance your experience across Construction Management and ensure we deliver you quality editorial content.

Registering also means you can manage your own CPDs, comments, newsletter sign-ups and privacy settings.

Story for CM? Get in touch via email: [email protected]

Latest articles in News