News

Images | O’Rourke and Murphy install modular bridge over M42

A joint venture between Laing O’Rourke and J Murphy & Sons has installed a 65m modular bridge spanning the width of the M42 in just two days.

The 2,750t bridge near what will become HS2’s Interchange station near Solihull was carried along the motorway on a self-propelled modular transporter.

The 448-wheel transporter took just one hour and 45 minutes to move the bridge span 150 metres, where it was affixed to a composite concrete deck to complete the overall bridge structure.

Register for free or sign in to continue reading

This is not a paywall. Registration allows us to enhance your experience across Construction Management and ensure we deliver you quality editorial content.

Registering also means you can manage your own CPDs, comments, newsletter sign-ups and privacy settings.

Story for CM? Get in touch via email: [email protected]

Latest articles in News