Video

Video | Farrans tunnelling machine breaks through River Tees crossing

https://www.youtube.com/watch?v=1WMN-ZNOD4A

Farrans has captured the moment a tunnel boring machine completed the excavation of the 220m underground crossing of the River Tees.

The operation is part of phase 1 of a new £155m water pipeline in County Durham and Tees Valley.

Main contractor Farrans and subcontractor Joseph Gallagher have constructed two shafts on either side of the river to create a pathway beneath the river, through which new pipes will be installed.

Register for free and continue reading

This is not a paywall. Registration allows us to enhance your experience across Construction Management and ensure we deliver you quality editorial content.

Registering also means you can manage your own CPDs, comments, newsletter sign-ups and privacy settings.

Story for CM? Get in touch via email: [email protected]

Latest articles in Video