Construction Management is the highest circulation construction-based publication serving the UK built environment.
News
Probe launched into blaze at tower block with safety issues
Cristina Lago Deputy Editor
More than 80 people were evacuated after the Dagenham fire, with firefighters leading residents out to safety and carrying out 20 rescues (Image: London Fire Brigade)
The London Fire Brigade (LFB) will start “a full investigation” into the causes of a huge fire that ripped through a block of flats in Dagenham, east London, in the early hours of Monday (26 August).
A total of 40 fire engines and around 225 firefighters tackled the blaze at the building on Freshwater Road, which was undergoing remedial works to replace non-compliant cladding.
The whole of the building was affected by the fire, including the scaffolding surrounding the property and the roof being used for the remedial works.
This is not a paywall. Registration allows us to enhance your experience across Construction Management and ensure we deliver you quality editorial content.
Registering also means you can manage your own CPDs, comments, newsletter sign-ups and privacy settings.
London Fire Brigade commissioner Andy Roe said the building had safety issues known to the LFB, which will begin a full investigation into the fire and its cause.
Roe said: “We were called to the incident at 02:44 [on Monday]. The first crew arrived within five minutes and the second crew arrived within six minutes. An aerial appliance also arrived in under six minutes. To allow us to focus our resources on the incident, we declared a major incident, which has now been stood down.
“The building has a number of fire safety issues known to London Fire Brigade. A full simultaneous evacuation of the building was immediately carried out and a significant search and rescue operation took place.
“We will now begin a full investigation into the fire and its cause. This was a very dynamic and challenging incident, and we know there will undoubtedly be concerns around the fire safety issues present within the building and this will form part of our report.”
The November/December 2025 issue of Construction Management magazine is now available to read in digital format.
Powered Access
CM, in partnership with IPAF, has launched a new survey to explore the industry’s views and experiences with powered access machines on construction projects.
This is not a first step towards a paywall. We need readers to register with us to help sustain creation of quality editorial content on Construction Management. Registering also means you can manage your own CPDs, comments, newsletter sign-ups and privacy settings. Thank you.