Digital Construction

Swarm robots 3D-print tunnel structure

HyperTunnel's Peak XV project
HyperTunnel's Peak XV, 3D-printed by swarm robots
Swarm construction robots have 3D-printed an underground structure for what is claimed to be the first time.

Tunnelling and underground construction technology start-up, HyperTunnel, built the structure at its R&D facility in the North Hampshire Downs. HyperTunnel claims its automated construction method is designed to build tunnels more than 10 times faster of conventional methods. And at half the cost.

Using swarm construction methods according to a digital twin of the tunnel, a fleet of ‘hyperBot’ robots enters the ground via an arch of HDPE pipes. The robots then 3D-print the tunnel shell by deploying construction material directly into the ground.

The 6m-long, 2m-high and 2m-wide Peak XV ‘pedestrian-scale’ tunnel was delivered as part of a project for Network Rail. It was revealed at the British Tunnelling Society Conference & Exhibition last week (11-12 October).

Register for free or sign in to continue reading

This is not a paywall. Registration allows us to enhance your experience across Construction Management and ensure we deliver you quality editorial content.

Registering also means you can manage your own CPDs, comments, newsletter sign-ups and privacy settings.

Story for CM Digital? Get in touch via email: [email protected]

Latest articles in Digital Construction