Technical

Structural Steel Design Awards 2024: n2 Nova Evolved, London

n2 Nova Evolved
n2 Nova Evolved: the steelwork trusses were positioned at the lower levels

Located opposite London’s Victoria railway station, n2 Nova Evolved is an example of how engineering excellence can unlock value in heavily constrained sites without compromising quality and sustainability.

Award: n2 Nova Evolved, London

Architect Lynch Architects, Veretec
Structural engineer Robert Bird Group
Steelwork contractor William Hare
Main contractor Mace
Client Landsec

Built on a confined site, surrounded by busy roads and neighbouring properties, and with transport and water assets located beneath, the 17-storey n2 Nova Evolved commercial building has overcome numerous challenges during its construction.

Register for free and continue reading

This is not a paywall. Registration allows us to enhance your experience across Construction Management and ensure we deliver you quality editorial content.

Registering also means you can manage your own CPDs, comments, newsletter sign-ups and privacy settings.

Story for CM? Get in touch via email: [email protected]

Latest articles in Technical