Technical

SSDA 2023: HYLO, London

SSDA 2023 HYLO London
Thirteen new steel-framed floors have been added to create a 29-storey tower (Photo: Grant Smith)

An outdated 1960s tower block has been reimagined with the addition of 13 new steel-framed upper floors and enlarged lower-level podiums.

Just north of the City of London’s northern boundary and a short walk from Old Street station, a tired 16-storey office block has been refurbished by stripping back the original concrete frame and adding 13 new steel-framed floors to create a 21st century 29-storey tower.

Award: HYLO, London

Architect: HCL Architects
Structural engineer: AKT II
Steelwork contractor: Bourne Group Ltd
Main contractor: Mace
Client: CIT Group

Register for free or sign in to continue reading

This is not a paywall. Registration allows us to enhance your experience across Construction Management and ensure we deliver you quality editorial content.

Registering also means you can manage your own CPDs, comments, newsletter sign-ups and privacy settings.

Story for CM? Get in touch via email: [email protected]

Latest articles in Technical