Construction Management is the highest circulation construction-based publication serving the UK built environment.
News
Laing O’Rourke uses thermal imaging for temperature checks
Laing O’Rourke has introduced temperature checks using thermal camera technology on its projects and in its offices to manage the risk from covid-19.
The cameras, which are installed into purpose-built modular units for sites, or mounted on ceilings in the entrances to offices, are situated at workplace access points.
They have already been used on HS2 and Hinkley Point C and in Laing O’Rourke’s manufacturing facility, Explore Industrial Park. They are now being rolled out to other projects including Royal Liverpool Hospital, Brighton 3Ts, Whiteleys, Soho Place and Olympia in the coming weeks.
This is not a paywall. Registration allows us to enhance your experience across Construction Management and ensure we deliver you quality editorial content.
Registering also means you can manage your own CPDs, comments, newsletter sign-ups and privacy settings.
Workers have to stand in view of a camera for a short period while it measures their skin temperature. A green light will indicate if their temperature is in the normal range, while an alert will sound and a notification will be sent to the system’s administrator if the individual’s temperature is at the upper limit.
If the alert does sound, the worker is asked to rest and
undergo a second test. If their temperature reads high for a second time then
they are asked to return home, follow the government’s guidelines and apply for
a coronavirus test.
Steve Paskins, Laing O’Rourke’s operation leader on its HS2 enabling works joint venture said: “We have introduced a number of new working practices and have developed a detailed plan to safely continue work based on the requirements of the Construction Leadership Council’s Site Operating Procedures.
“There is no replacement for good cleanliness and social distancing rigour but we’ve found that the temperature checking units work quickly and accurately, and while the system cannot detect if coronavirus is present, their ability to pick up a fever – one of the main symptoms of covid-19 gives us, everyone on site, as well as their families assurance that colleagues have all been checked before entering the project. The feedback has been good, and the technology is an important element within our armoury.”
Developed by Select Plant, the thermal screening ‘plug and
play’ modular units will also be available for hire to other contractors.
The November/December 2025 issue of Construction Management magazine is now available to read in digital format.
Powered Access
CM, in partnership with IPAF, has launched a new survey to explore the industry’s views and experiences with powered access machines on construction projects.
This is not a first step towards a paywall. We need readers to register with us to help sustain creation of quality editorial content on Construction Management. Registering also means you can manage your own CPDs, comments, newsletter sign-ups and privacy settings. Thank you.